Check out the traffic and travel updates for current and forthcoming road closures and roadworks in Cambridgeshire over the coming days and weeks.

Abnormal Load - Cambridgeshire

There will be an abnormal load coming through Cambridgeshire today (March 28). The route will be along the A14 (eastbound) from Thrapston to A14 Junction 33 at Milton A10 and then (northbound) to King's Lyn. The reverse route will apply on March 28.

B1096 High Street - Ramsey

This road will be closed between Hollow Lane and Great Whyte to all motor vehicles between April 2-11 due to works by Gigaclear. 

A1101 Bates Drove - Littleport 

Closed both ways to all traffic until May 31 for works.

Church Street - Whittlesey 

B1040 between London Street and Briggate Way closed both ways to all traffic until March 28 due to works by UK Power Networks.

Middle Road - March

This road will be closed both ways to all motor vehicles between April 2-4 due to works by Anglian Water. 

High Road - Gorefield 

Two-way signals in place until March 28 due to emergency works by Anglian Water to repair a leaking main.

Soham Road - Fordham

This road will be closed both ways to all motor vehicles between April 2-4 due to works by Anglian Water.

Church Lane - Chatteris

This road will be closed to all motor vehicles between April 2-4 due to works by Anglian Water

Planned rail engineering works: 

Buses will replace trains on March 29 and 30 March between: Cambridge North and Ely, Cambridge and Bury St Edmunds via Newmarket.

Buses will replace trains on March 31 between: Cambridge North and Ely, Norwich and Cambridge North, Bury St Edmunds and Peterborough via Ely.

On April 1, buses will replace trains between: Ely and Cambridge North.

Fenstanton Busway

The South Section of the Busway will be closed in both directions for the erection of a permanent fence until March 29.

B1093 Fifty Road - Manea

This road will be closed to all motor vehicles between April 2-10 dues to works by Anglian Water.

West Road - Cambridge 

This road will be closed to all motor vehicles between April 1-14 dues to works by Cambs Water. 

The Causeway - Elsworth

This road will be closed both ways to all motor vehicles between April 1-10 for works. 

Cherry Hinton Road - Great Shelford 

This road will be closed both ways to all motor vehicles between March 29 - April 14 due to works by UK Power Networks.

A505 Royston Road - Duxford

The road will be closed both ways to all motor vehicles until April 27 between the hours of 9pm and 5am nightly for works.

Hinton Way - Great Shelford

The road will be closed both ways to all motor vehicles until June 7 due to works by Cadent Gas.

Swaffham Heath Road - Dullingham

The road will be closed both ways to all motor vehicles until June 12 for works.

Plash Drove - Tholomas Drove 

This road will be closed both ways to all motor vehicles between March 27 and April 9.

Pools Road - Wilburton

This road will be closed both ways to all motor vehicles between March 27 and April 5 between the hours of 9:30am and 3:30pm daily.