REGARDING the Wisbech to March Bramley Line, Network Rail has NOT disclosed a cost of renewing the track between both town. I urge local residents to attend their meetings and so they can see the way forward for the group. I have attended several meetings

REGARDING the Wisbech to March Bramley Line, Network Rail has NOT disclosed a cost of renewing the track between both town.

I urge local residents to attend their meetings and so they can see the way forward for the group.

I have attended several meetings so in relation to the 'alleged' £1 million pound price tag for new track that is merely misinformation.

Join the Group and read the FACTS and NOT the FICTION.

Craig Castleton

Chelmsford

(via email)